Unit Commissioning
New Product
Supplier: Binder
Jump to:
About this item
Connect the unit to the customer-side connections (electricity, water, wastewater, gas), basic functions check, brief operating instructions. (excl.: unpacking, setup, controller instructions, programming, installation work).
3 Options Available Below
Product Details & Documents
Connect the unit to the customer-side connections (electricity, water, wastewater, gas), basic functions check, brief operating instructions. (excl.: unpacking, setup, controller instructions, programming, installation work).
Product Family Options
Product Information
- ForAvailabilityPrice
- 390-2030Unit commissioningSpecifications:New ProductNew Product
- 390-1998Unit commissioningUnit commissioningB, BD, BF, BD-S, E, ED, FD, FED, FP, M, ED-S, FD-SLog in for availability1 * 1 Pce368,00 €Specifications:New ProductNew Product
- 390-1999Unit commissioningUnit commissioningCB-S, CB, KT, KB ECO, KB, KB PRO, UF V, VD, KBF S ECO, KBF, KBF PRO, MK, MKTLog in for availability1 * 1 Pce553,00 €Specifications:New ProductNew Product



